A short checklist for Brunswick and Cleveland-area homeowners to make installation day faster and avoid delays.

Clear the installation area of furniture, rugs, and personal items — we ask that large furniture be moved out ahead of time, and we can assist with smaller pieces. Remove wall art, mirrors, and anything fragile from walls near the work area, since foot traffic and equipment vibration can loosen hanging items.
If you have pets, plan for them to be in a separate part of the house or offsite during installation — open doors, moving equipment, and strong adhesive odors from certain products can stress animals and create a safety risk.
Installation typically begins with a final walkthrough to confirm scope, followed by removal of existing flooring (if applicable) and a subfloor check. If leveling or moisture protection was scoped and approved in your quote, that work happens before any new flooring is installed — never after, and never skipped to save time.
A standard room takes 1–2 days; whole-home projects typically run 3–5 days depending on square footage and how much prep work is required.
Most flooring types need a short settling period before heavy furniture goes back — we'll walk you through any manufacturer-specific care instructions for your particular floor type before we leave. If you're still deciding on a flooring style, our free AI floor visualizer lets you preview your actual room before installation day even gets scheduled.
Upload a photo of your room and preview this flooring style with our free AI visualizer.